Penhurst

Project Info:

Magnificent existing house thats over 950m2 in size and having a complete renovation and re-design of its internal layout. The new owners of this property wanted it to be heavily insulated and were keen for an all-inclusive renewables package, this complicated installation incorporates.

50KW Biomass boiler with large pellet hopper that for convenience is only filled twice a year, located 70 meters
away from the house in the basement of the existing pool house basement
Under-floor heating throughout with concrete screed on ground floor and installed between joist on next two floors
Mechanical Ventilation and Heat Recovery
Hydrogen fuel cell to generate low cost electricity

Technology Used in Project: